Archive

News
Award for the Great Mosque of Algiers at the Engineering Construction Prize 2022

[Berlin, 24.01.2022] The engineering services provided by KREBS+KIEFER for the Great Mosque of Algiers were awarded at the renowned Ernst & Sohn…

News
Great Mosque Algiers nominated for Engineering Construction Award 2022

[Berlin, 22.11.2022] The Great Mosque of Algiers, designed by KREBS+KIEFER together with KSP Engel, has been nominated for the prestigious Ernst&Sohn…

News
Kienlesberg Bridge awarded Hugo-Häring-Landespreis 2021

[Baden-Baden, Nov. 19, 2021] The Kienlesberg Bridge in Ulm receives the prestigious Hugo Häring State Prize (Hugo-Häring-Landespreis) 2021 of the…

News
KREBS+KIEFER and Dorsch Gruppe enter a strategic partnership

[Frankfurt am Main, Nov. 15, 2021] The pooling and expansion of competences provide the best basis for a sustainable building infrastructure as…

News
Bridge completion during the construction of the Interstate Sava Bridge near Gradiška

[Gradiška, 15.10.2021] On Friday, 15.10.2021, the large-scale project of the Interstate Sava Bridge near Gradiška, financed by the EIB (European…

News
Great Mosque of Algiers awarded "The International Architecture Award 2021"

[Darmstadt, 30.10.2021] The third largest mosque in the world "Djamaâ el Djazaïr" has been awarded the "International Architecture Award 2021" in the…

News
Changes in the management at KREBS+KIEFER

[Darmstadt, 01.07.2021] We are pleased to announce the following changes in our management as of 01.07.2021:

News
A 143 motorway: Halle western bypass (VDE No. 13) - under construction
News
"LET’S DANCE" - INAUGURATION OF THE NEW HEADQUARTERS OF THE SAXON MEDICAL PENSION PROVIDER
News
Appointment of Alwin Hoffmann as holder of Prokura
News
Appointment of Alwin Hoffmann as holder of Prokura
News
5 years of extension of Tram 8 - A success story

As the first cross-border tram line after World War II, the extension of tram Line 8 between Basel and Weil am Rhein was put into operation on 14…

News
Re-opening of Bundeswehrfachschule in Karlsruhe

Since September of this year, the vocational school of the German Army Bundeswehr in the Kirchfeld Barracks has been in operation again. The…

News
Opening of waterpark „Rulantica“ in Europapark Rust

As announced by the overall project manager Charles R. Botta since the beginning of the year, the new water park "Rulantica" as part of the Europapark…

News
BAW-Colloquium on the maintenance of lock installations

On 19 and 20 November, the BAW (Federal office for hydraulic engineering) organized a colloquium on the highly topical theme of "Preservation of water…

News
Wiesenfeld bypass: planning documents disclosed in the planning approval process

With the completion of the planning of performance phase 2-4 on the part of KREBS+KIEFER, the planning approval procedure for the Wiesenfeld bypass is…

News
Construction Career Day at the TU Berlin

Under the heading "jobwunderBAU", a career day with 30 exhibitors took place for the first time on 12 November at the Institute of Civil Engineering…

News
Topping-out ceremony for Wohnpanorama am Park – Dennewitzstraße 36-42

Right next to the park at the track triangle, the new building ensemble “Wohnpanorama am Park” is currently growing up. In the center of Berlin, where…

News
KREBS+KIEFER wins the Structural Award 2019 with Kienlesberg Bridge

The Kienlesberg Bridge in Ulm was awarded the prize in the category "Vehicle Bridges" at the Structural Awards 2019 of the British Institution of…

News
ADVANCED TRAINING EVENT VSVI BADEN-WÜRTTEMBERG IN NÜRTINGEN

On 24.10.2019 this year's advanced training event for bridge construction engineers of the VSVI Baden-Württemberg took place in Nürtingen with about…

News
A 7 HAS THE FIRST COVER ON IT

The widening of the A 7 between the motorway entrance (AS) HH-Schnelsen-Nord and the junction (AD) HH-Nordwest is only a few weeks away from its…

News
Ground-breaking ceremony for the Kallmerode bypass as part of the B 247

Steffen Bilger, Parliamentary State Secretary to the Federal Minister of Transport and Digital Infrastructure, together with Thuringia's Transport…

News
Topping out ceremony for the new Biomedicum building on 14 October 2019

After only 12 months, the topping-out ceremony for the Biomedicum of the University Medical Center at Rostock was celebrated on 14.10.2019 in a…

News
6th Young Engineers Colloquium of the German and Polish IABSE Group in Berlin

On 11 October the 6th Young Engineers Colloquium of the German and Polish group of the International Association for Bridge and Structural…

News
Promotion of the next generation of skilled workers

The diverse tasks in the construction industry require highly qualified specialists. It is important to inspire young people and to accompany them on…

News
1st Symposium Civil Engineering - Design for Construction in Stuttgart

On November 22nd the first symposium "Civil Engineering - Design for Construction" will take place in Stuttgart on the campus of ABK Weißenhof. Based…

News
PIANC Smart Rivers Conference 2019 in Lyon

KREBS+KIEFER was present at the World Congress of Inland Waterways from 30 September to 3 October in Lyon. Under the direction of PIANC, almost 400…

News
Tunnel inset celebration at Brandbergtunnel

On 28.09.2019 the tunnel inset celebration at the Brandberg Tunnel took place in the presence of numerous celebrities. The overall structure of the…

News
Opening of element-i Bildungshaus in Karlsruhe

With a celebration for young and old, the first element-i educational building in Karlsruhe was opened on September 20, 2019 after a construction…

News
KREBS+KIEFER at the EXPO REAL 07.-09.10.2019

For the sixth time in a row, we will be represented as a stand partner of the Science City Darmstadt at EXPO REAL, the largest European trade fair for…

News
Ground-breaking ceremony for the new open-air pool has taken place - The open-air pool at Nieder-Modauer-Weg in Ober-Ramstadt receives a complete renovation

Thursday, 25.07.2019 - a day on which even in the shade at least 38 degrees were measured. A day on which in many places the only question was whether…

News
Professur von Jochen Kliver an der Hochschule Mainz

Herr Prof. Dr.-Ing. Jochen Kliver, der seit 2010 bei KREBS+KIEFER tätig ist, hat seit März die Professur für Massivbau an der Hochschule Mainz inne.…

News
A66 Ersatzneubau Salzbachtalbrücke und UF DB/Aartalbahn

Die Salzbachtalbrücke führt die Bundesautobahn A66 an den Toren der Landeshauptstadt Wiesbaden vorbei. Das Bauwerk liegt zwischen Rüdesheim und…

News
APPOINTMENT OF MR KRISSAN GUSKE AS MANAGING DIRECTOR OF KREBS+KIEFER IN BERLIN

With effect from 1 July 2019, Dipl.-Ing. (FH) Krissan Guske was appointed Managing Director of KREBS+KIEFER Ingenieure GmbH.

News
OPENING OF THE WASSERWERK BRIDGE KARLSRUHE

With the obligatory cutting of the ribbon - this time in the Baden national colours - the Lord Mayor of Karlsruhe, Dr. Frank Mentrup, opened the…

News
Visit of construction site at the Rälsbach and Rinsdorf viaducts

On the German motorway A45, all major viaducts will have to be replaced by new constructions in the next few years. In the area of Wilnsdorf there are…

News
Symbolic start of construction in planning approval section 9.0 of the extended and newly built Karlsruhe - Basel line

On 02.07.2019, the symbolic start of construction work in the planning approval section 9.0 (Müllheim-Auggen) of the upgraded and newly built…

News
Building cultures workshop "public spaces" in Ulm

As part of the preparations for the Building Cultures Report 2020/21 "Public Spaces", the Federal Foundation for the Culture of Building organized…

News
Symbolic ground-breaking ceremony for the extension of the Bundesrat with Visitor Centre in Berlin

At the beginning of the preparatory measures for the extension of the Bundesrat, Daniel Günther, President of the Bundesrat and Prime Minister of…

News
New laboratory building for the Criminal Science and Technology Institute (CTI) in Saxony

The Free State of Saxony is planning the construction of a new laboratory building for the Criminal Science and Technology Institute (CTI) for 60…

News
Innovative new building "The Ship" in Cologne

The new office building "The Ship" is being built in the Ehrenfeld district of Cologne. Together with the historic building "Alte Wagenfabrik" it will…

News
Extension of the Otto Lilienthal School in Wustermark
News
Unique addition to the Catholic Hospital in Mainz
News
Halle western bypass: A 143 motorway to be continued
News
Ground-breaking ceremony for creation center at the Dresden University of technology and economy
News
Last escalator for the stops in Karlsruhe is installed
News
Festive opening of the winegrowers’ cellar in Ingelheim am Rhein
News
Colloquium "Resilience of engineering structures" in Strasbourg
News
KREBS+KIEFER on konaktiva in Darmstadt
News
New building Leonardo da Vinci Grammar School: Topping out ceremony on 05/09/2019
News
Topping out ceremony of the Pergamon Museum in Berlin
News
Foundation stone laid for the new Tuttlingen District Office
News
Successful trial operation of the ship lift at the Three Gorges Dam
News
Foundation stone laid for the German Embassy in Algiers
News
New building for 27,000 zebrafish and 120 scientists at KIT

Topping-out ceremony on 14 March 2019 for the new building at the northern campus of the Karlsruhe Institute of Technology (KIT). From the end of this…

News
Lifting-in of the Karlsruhe waterworks bridge

On 23 and 24 March 2019, the bridge closure at the new waterworks bridge planned by KREBS+KIEFER took place with the lifting-in of the central high…

News
Laying of the foundation stone for SC Freiburg stadium

On 29 March 2019, the foundation stone for the new Freiburg football stadium with around 35,000 spectators was ceremoniously laid. KREBS+KIEFER has…

News
KREBS+KIEFER Karlsruhe 2.0
News
Ground-breaking ceremony for the extension of the pedestrian underpass in Lauda-Königshofen

On 18.03.2019 the ground-breaking ceremony for the extension of the existing pedestrian underpass at Lauda railway station took place. The eastern…

News
FESTIVE INAUGURATION OF THE TECHNICAL COLLEGE AT THE JAKOB-BRUCKER-GYMNASIUM KAUFBEUREN

On 11 March 2019, the Jakob-Brucker-Gymnasium school family celebrated the solemn opening of the new building for the natural sciences, which was…

News
29th Dresden Bridge Construction Symposium

On the 11th and 12th of March 2019 the Dresden Bridge Construction Symposium took place for the 29th time. The Dresden Bridge Construction Symposium…

News
New high-tech location for ZEISS in Jena

On October 13, 2017, the global technology leader ZEISS announced that more than 300 million euros would be invested in a new location in Jena.

News
Topping-out ceremony for "THE CIRCLE" at Zurich Airport

Over 1000 invited guests from among the construction partners, including the team of KREBS+KIEFER Karlsruhe, could take a proud look at the impressive…

News
Prefabricated part embedded in Neckar according to plan

The Ladenburg flood barrier gate blocks the side canal between Ladenburg and Mannheim-Feudenheim in the event of flooding in order to protect the…

News
German Construction Technology Day 2019 in Stuttgart
News
Award at the Ulrich Finsterwalder Civil Engineering Prize 2019

On 12 February 2019, the Kienlesberg Bridge was awarded the prestigious Ulrich Finsterwalder Engineering Prize. KREBS+KIEFER is responsible, in a…

News
Dr. techn. Sven Huismann is testing engineer for fire protection

On 15 January 2019, the Berlin Senate recognized Dr. Sven Huismann as a testing engineer for fire protection.

News
Contribution of Hessischer Rundfunk to the FAIR project in Darmstadt

The FAIR project (Facility for Antiproton and Ion Research) in Darmstadt aims to find answers to these questions: how things are composed on the…

News
Construction progress Combination solution Karlsruhe

Work on the Karlsruhe combi-solution will continue in the new year. Drivers in Karlsruhe must therefore prepare themselves for further diversions due…

News
Appointment of new managing directors and holders of prokura at KREBS+KIEFER

Nothing is as constant as change. KREBS+KIEFER is also continuing to shape this change and continuously pursues a strategic personnel development. We…

News
Anerkennung von Dr.-Ing. Regine Schneider und Markus Henzel M.Eng. / B.A. zu Prüfsachverständigen für Brandschutz

Mit Wirkung zum 14. November 2018 wurden Frau Dr.-Ing. Regine Schneider und Herr Markus Henzel M.Eng. / B.A. als Prüfsachverständige für Brandschutz…

News
OPENING OF THE EASTERN TUBE IN THE TUNNEL STELLINGEN

About a month after the fire protection systems of the tunnel tubes were tested, the next milestone was reached on Monday, 10.12.2018 on the A7…

News
KREBS+KIEFER wins tender for EÜ Beckerbrücke (Chemnitztal viaduct)

The planned replacement construction of the EÜ Beckerbrücke bridge in Chemnitz - known as the Chemnitztal viaduct -, which requires a complete…

News
U4 TO THE ELBBRÜCKEN OPENED

On 9 December 2018, the line section under construction since 2014 was connected to the network of the elevated railway in Hamburg. The extension of…

News
Complete closure of the A8 near Pforzheim - KREBS+KIEFER ensures the safety of the execution

From 30 November 2018, 22:00 to 03 December 2018, 06:00, the steel superstructure of the new railway overpass of the DB line 4200 over the motorway…

News
LAYING OF THE FOUNDATION STONE FOR THE FRAUNHOFER INSTITUTE BUILDING MEVIS

The Fraunhofer Institute for Medical Image Computing MEVIS receives a new institute building at its main location in Bremen, and the foundation stone…

News
Innovative thinking in construction: Svenja Göbel receives award for her Master's thesis

Our colleague Ms. Svenja Göbel received the second prize in the civil engineering category for her outstanding Master's thesis within the framework of…

News
TOPPING-OUT CEREMONY AT THE NEW HEAD-QUARTERS OF THE DOCTORS’ INSURANCE IN SAX-ONY

On 26 November 2018, the symbolic last nail struck for the topping-out ceremony of the future headquarters of the Landesärzteversorgung Sachsen. Lord…

News
4th Symposium "Rehabilitation of Engineering Structures" in Nuremberg

At the 4th symposium on "Rehabilitation of Engineering Structures" in Nuremberg on 20.11.2018, which was very well attended and is now firmly…

News
CEREMONIAL HANDOVER OF THE HEINZ SCHÖNFELD AUDITORIUM AT THE BARK-HAUSEN BUILDING OF THE TU DRESDEN

On 23 November 2018 the key for the Heinz-Schönfeld lecture hall as part of the Barkhausen-Bau ensemble of the TU Dresden was ceremoniously handed…

News
Ceremonial inauguration of the joint new building for the Centre for Innovation Competence B-CUBE and the German Centre for Neurodegenerative Diseases in the Helmholtz Association e.V. (DZNE)

On 16 November 2018, the Minister of State for Finance, Dr Matthias Haß, the Rector of the University of Technology in Dresden, Prof Hans…

News
Groundbreaking ceremony for "New Quarter Depot" in Karlsruhe

Start of construction for an attractive city entrance: The former depot of the municipal transport services of the city of Karlsruhe is given a new…

News
Kienlesberg Bridge (Ulm) shortlisted for Ulrich Finsterwalder Engineering Award 2019

The public transport, pedestrian and cycle path bridge for which KREBS+KIEFER is responsible in a joint venture with Knight Architects (UK) is one of…

News
KREBS+KIEFER wins Europe-wide competition procedure

In order to connect two existing schools, the Sigmund-Schuckert-Gymnasium and the Peter-Henlein-Realschule, one of the largest schools in the Land…

News
Contract awarded for building physics for the construction of the new Gruner+Jahr cor-porate headquarters in Hamburg

HafenCity in Hamburg will be home to the new headquarters of Gruner+Jahr publishing house from 2021. The London architects Caruso St John and the…

News
Laying the foundation stone at the Biomedicum new construction project in Rostock

On 22 October, 2018 the foundation stone for the new construction of the Biomedicum in Rostock was laid with a festive event. A new teaching and…

News
Panel discussion at the Expo Real 2018 on the topic of Digital Transformation

Our colleague Carin Jahnel, in her function as a board member of the association of Women in Real Estate [Frauen in der Immobilienwirtschaft e.V.],…

News
Inauguration of the Port Hamburg HafenCity “Intelligent Quarters”

The evening of 26 September 2018 was the night of a spectacular party at the seaport of Hamburg. About 700 guests, together with Hamburg’s Senior…

News
Laying of the foundation stone for the new construction of the Leonardo-da-Vinci Gymnasium in Berlin

On 04/10/2018 the foundation stone laying was celebrated as an important milestone for the realization of the 5-tract Gymnasium (college prep school).…

News
FESTIVE INAUGURATION OF THE BRUCKLYN QUARTERS IN ERLANGEN

The Jost group of companies introduced the Brucklyn neighborhood in Erlangen with a spectacular party.

News
Frankfurt is celebrating its revitalized Altstadt [historical city center]

Frankfurt reclaims a piece of history. The Dom/Römer area has been open for pedestrian traf-fic since May 2018 and residents as well as tourist can…

News
KREBS+KIEFER celebrates its 20th Anniversary in Freiburg

The most southern location of KREBS+KIEFER in Germany was founded in Freiburg in 1998. Reason enough for an information gathering visit and a festive…

News
KREBS+KIEFER PRESENTS THE GREAT MOSQUE OF ALGIERS ON THE 40TH IABSE SYMPOSIUM IN NANTES

Following the topic of the day Tomorrow’s Megastructures, the construction process for the mega project of the Great Mosque of Algiers was presented…

News
Fire Prevention seminar "PlusPunkt" in Darmstadt

On 19 September 2018 KREBS+KIEFER hosted at its Darmstadt location the first „PlusPunkt Brandschutz“ event. Prof. Dr.-Ing. Ulrich Dietmann and Mr.…

News
A NEW LANDMARK FOR ULM - CHRISTENING OF THE KIENLESBERG BRIDGE

On 12 September 2018, as part of a colorful bridge christening ceremony, the Kienlesberg bridge was accessible for the first time to the local…

News
EPPSTEIN TRAIN STATION IS NAMED TRAIN STATION OF THE YEAR 2018

On 31 August 2018 the railway club “Allianz pro Schiene” nominated the new railway station in Eppstein for the train station of the year. KREBS+KIEFER…

News
ANNOUNCING THE PRESENTATION BY DR. NADJA BISHARA AT THE IBPC2018 IN SYRA-CUSE, NEW YORK

Our associate Dr. Nadja Bishara will present at the International Building Physics Conference 2018 in Syracuse, New York on September 26, 2018 on the…

News
INAUGURATION CEREMONY FOR THE CENTER FOR RADIOPHARMACEUTICAL TUMOR RESEARCH AT THE RESEARCH CENTER COMPLEX IN DRESDEN-ROSSENDORF

On 4 September 2018 the Federal Ministry of Education and Research, State Secretary Dr. Georg Schütte, Saxony's economy minister Dr. Eva-Maria Stange,…

News
KREBS+KIEFER at the EXPO REAL 2018

For the fifth time in as many years we will be presenting this year as stand partners at the EXPO REAL, the largest European commercial real estate…

News
The “Wildspitze” points to a sustainable future

An 18-storey high-rise built almost entirely out of wood will become the new headquarter of the German Wildlife Foundation: Germany’s highest wooden…

News
Topping-out ceremony at the Mainz Archaeological Center

Topping-out ceremony in Mainz on 17 August 2018: The reinforced concrete body of the Roman-Germanic Central Museum, also called RGZM, whose foundation…

News
New Construction of BAB A1 viaduct in Volmarstein

A structural inspection in Volmarstein in 2011determined that the viaduct was damaged and needed to be rebuilt. This decision was based in no small…

News
Combined Solution Karlsruhe: Construction phase 2

Construction phase two of the combined Karlsruhe solution started on 26 August and lasted through 9 September 2018; the construction zone was between…

News
GRAND OPENING OF THE NEW BUILDING AT THE CENTER FOR ADVANCING ELECTRONICS, DRESDEN (CFAED)

A model made of carbon atoms, which contains the digital key to cfaed for the building project of the Cluster of Excellence, was handed over to Prof.…

News
Combination solution in Karlsruhe: Railway stations are getting new interiors

Additional benefits are becoming apparent as a result of the combined solution Karlsruhe, which will be connecting the transportation companies…

News
CEREMONIAL HANDOVER OF THE CENTER FOR MATERIALS, ARCHITECTURE AND INTEGRATION OF NANOMEMBRANES – MAIN – AT THE TU CHEMNITZ

On 13 August, during the course of a festive celebration, Minister of Finance Dr. Matthias Haß and Minister of Science Dr. Eva-Maria Stange handed…

News
KREBS+KIEFER establishes a new location in Mannheim

Since August 1, 2018 KREBS+KIEFER is now also represented in the heart of the Rhine-Neckar metropolitan region.

News
Festive opening ceremony to honour the construction of a new laboratory and seminar hall at the Karlsruhe University of Applied Sciences - Engineering and Business
News
Ground breaking at the new construction of the Karlsruhe tax offices

The cornerstone ceremony on July 20, 2018 signified the commencement of the new construc-tion of Karlsruhe’s tax offices, at an estimated cost of 25…

News
Formal inauguration of the “Dreizack“ [Trident] in Weil am Rhine

The cross-border extension of the Basel streetcar line #8 that reaches the city centre of Weil am Rhine has enjoyed lively popularity ever since the…

News
The Great Mosque of Algiers - Djamaâ El Djazaïr - construction is nearing completion.

KREBS+KIEFER, as part of a collaborative group, provided the general planning for this cultur-al-historical monument, mainly led the engineering…

News
At the “Structural Engineering Colloquium” [Kolloquium Konstruktiver Ingenieurbau] of the TU Berlin, Prof. Akkermann from KREBS+KIEFER impressed Karlsruhe with com-pletely new dimensions

On Thursday, June 19, 2018, Prof. Dr.-Ing. Jan Akkermann, Managing Director and partner at KREBS+KIEFER Ingenieure GmbH and professor at the Technical…

News
KREBS+KIEFER presents at the international IABSE bridge conference in Copenhagen

On June 25 and 26, 2018 the “International Association of Bridge and Structural Engineering” (IABSE) conference took place in Copenhagen. KREBS+KIEFER

News
New construction of the fire-fighting equipment building between the Rhine-Hesse community Bodenheim and Nackenheim

The two communities are having a new communal fire-fighting equipment station built between Bodenheim and Nackenheim near Mainz.

News
Topping-out ceremony at St. Vincent Hospital in Karlsruhe

Today’s biggest hospital construction site in the Southwestern region of Germany is the new construction of the St. Vincent hospitals in Karlsruhe. On…

News
Opening ceremony in Frankfurt am Main - DomRömer area is accessible again!

For a long time, construction fences, high scaffolding, container parks and various construction equipment on the approximately 7000 m² area between…

News
KREBS+KIEFER beim Darmstädter Merck-Firmenlauf 2018

Am 16. Mai 2018 beteiligte sich KREBS+KIEFER Darmstadt zum zweiten Mal am Darmstädter-Merck-Firmenlauf und dies mit einer Rekordteilnehmerzahl von…

News
Topping out ceremony for the new specialist subject classroom wing at the Jakob Brucker grammar school in Kaufbeuren
News
Topping-out ceremony at Quartier West in Darmstadt

At 11 AM on Friday April 27, everyone involved in the buildings celebrated the topping-out cere-mony for the new office and hotel building on…

News
Cornerstone Ceremony for the 1&1 Office Complex in Karlsruhe

The cornerstone ceremony for the 1&1 office complex immediately behind Karlsruhe central station took place on April 10, 2018. The 145-million euro…

News
Fire protection concepts: Starting in April, lectures return to the Beuth University of Applied Sciences in Berlin

For the sixth time in succession, Dr. Huismann begins his fire protection concepts lec-ture series at the Beuth University for Applied Sciences in…

News
Topping-out ceremony at the Fraunhofer Institute for Physical Measurement Techniques (IPM) in Freiburg

The completion of the Fraunhofer IPM structural works was celebrated on March 26, 2018 with the traditional topping-out address and well wishes for…

News
Topping-out ceremony for the new vocational education and technology centre of the Chamber of Skilled Crafts in Trier.

On March 16, 2018 the Chamber of Skilled Crafts (HwK) Trier celebrated the topping-out ceremony of the new vocational and technical education centre…

News
3. Hessian Fire Protection Day offers lively exchange with experts

The third Hessian Brandschutztag [Fire Protection Day] attracted 350 participants from planning and management sectors to Neu-Isenburg. Prof. Dr. Ing.…

News
Topping-out ceremony for the historic wine cellar in Ingelheim on the Rhine

On March 16, 2018 the topping-out ceremony for the historic wine cellar in Ingelheim on the Rhine was celebrated after an almost 2-year construction…

News
KREBS+KIEFER Berlin football team wins 3rd place in the Bauingenieurcup [Structural Engineering football Cup]!

March 25, 2018 was the second time in as many consecutive years that the KREBS+KIEFER Berlin football team has participated in the TU Berlin…

News
Dresden Brückenbausymposium 2018 - again with KREBS+KIEFER

KREBS+KIEFER had a strong presence again in this year’s, the 28th, Brückenbausymposium in Dresden. With 1500 participants, this is one of the largest…

News
“CHARLIE LIVING – Topping-out ceremony on March 9, 2018

The topping-out ceremony of "Charlie Living” took place by sunny weather at Zimmerstrasse 92-94 on March 9, 2018, close to the famous border crossing…

News
Stuttgart 21, planning approval section 1.5 - Bad Cannstatt Tunnel and Feuerbach Tunnel

Breakthrough celebration for the west tunnel of the Feuerbach tunnel |
Next milestone achieved for access from the north to Stuttgart central Station

News
Breakthrough Celebration of the Herrschaftsbuck Tunnel on the A 98 Motorway

After just six months of construction time, the breakthrough of the Herrschaftsbuck Tunnel was celebrated in bright sunshine on the A 98 motorway near…

News
Controlled explosion of Mannheim radio tower

New student halls of residence are to be built on the grounds of the Benjamin Franklin Village and the Funari Barracks in Mannheim. KREBS+KIEFER…

News
Appointment of new Managing Directors and General Managers at KREBS+KIEFER

KREBS+KIEFER continues to grow and steadily develop itself further internationally as an esteemed expert partner. At the beginning of 2018, there have…

News
Hiring of Julia Anderson and founding of the Marketing & Communication department at KREBS+KIEFER

As of 01 January 2018, the position of head of Marketing & Communication was created for KREBS+KIEFER. Ms. Julia Anderson has held this position since…

News
KREBS+KIEFER sponsors student competition at KIT (Institute of Technology in Karlsruhe)

The topic of this year’s construction competition at KIT (Institute of Technology in Karlsruhe) was “Skywalk-torsion carrier” and was organised by the…

News
KREBS+KIEFER on The 30th FIDIC International Contract Users‘ Conference in London

KREBS+KIEFER International this year again was attending the FIDIC International Contract Users‘ Conference in London from 5th to 6th December 2017.

News
Topping out ceremony - Quarter G in Wiesbaden

With the topping out ceremony for Quarter G on 6 December 2017 in the Weidenborn district of Wiesbaden, a 10-year construction phase came to an end.…

News
Academic awards for Ms Selina Öniz

Ms Selina Öniz M.Sc., a colleague at KREBS+KIEFER in Karlsruhe, has received multiple awards for her master’s thesis.

The paper, entitled “Dissipative…

News
KREBS+KIEFER at „students at work“

As part of the series of lectures "students at work" at TU Darmstadt and Darmstadt University of Applied Sciences, KREBS + KIEFER International held a…

News
Freiburg Citizens’ Service Centre opened

On 21/11/2017, the new city hall was officially opened in the Stühlinger district in Freiburg as the world's first plus energy administration…

News
structure_architecture: Presentation of the Kienlesberg Bridge in Ulm at the Karlsruhe University of Applied Sciences

On November 15th 2017, as part of the lecture series “structure_architecture” at the Karlsruhe University of Applied Sciences, Dipl.-Ing. Bartlomiej…

News
21st Structural Design Seminar at the Technical University of Dresden

On 20 October 2017, Professor Jan Akkermann, a member of the teaching staff at the Karlsruhe University of Applied Sciences, and Managing Director at…

News
KREBS+KIEFER at the Thuringian shared stand at Expo Real 2017

Expo Real is Europe's largest trade fair for real estate and investment. With around 2000 exhibitors and more than 40,000 participants, Expo Real is…

News
KREBS+KIEFER at EXPO REAL 2017

For the fourth year in succession, KREBS+KIEFER will be represented as a stand partner at EXPO RE-AL, the largest European trade fair for commercial…

News
“Am Gautor” Primary School Inauguration in Oppenheim

On 02 September 2017, the rehabilitated and enhanced primary school “Am Gautor” in Oppenheim was inaugurated within the scope of its 90th anniversary.…

News
Inauguration of the research and development centre of the Deutsche Amphibolin-Werke (DAW) in Gerstungen

At the location in Gerstungen, the new research and development centre of DAW SE (Deutsche Amphibolin-Werke) was inaugurated on 28 August 2017.

The…

News
Opening of the Platz der alten Synagoge in Freiburg

On 2 August 2017, the Platz der alten Synagoge was opened to the public after a redevelopment period of almost 16 months.

KREBS+KIEFER planned and was…

News
Ground-breaking ceremony at the B8 bridge over the dock railway in Frankfurt am Main

On 31 July 2017, the ground-breaking ceremony for the renovation of the bridge on the Hanau secondary road over the dock railway in Frankfurt – Osten…

News
Commencement of tunnelling works of the Herrschaftsbuck Tunnel in Rheinfelden

The construction of an important element of the Upper Rhine Motorway, the A 98 motorway was started on the 27 July 2017 with the solemn commencement…

News
Groundbreaking ceremony for the extension and renovation of the Jakob Brucker High School in Kaufbeuren

The official construction start for the expansion and renovation of the Jakob Brucker High School in Kaufbeuren was celebrated on 26 July 2017 with a…

News
Managing Director Fabian Ruhl discusses construction logistics with the Gießener Allgemeine Zeitung

KREBS+KIEFER has for years been successfully supporting major projects with their construction logistics. Whether in terms of obtaining approval such…

News
Ground-breaking ceremony for the new building of the Leonardo da Vinci Gymnasium in Berlin

The new building of the five-storey high school is designed for around 900 pupils and is characterised by its open and bright design.

The school is a…

News
Laying of the foundation stone for the Fraunhofer Institute for the IPM Physical Metrology in Freiburg

With the ceremonial burial of a "time capsule", the official start of the construction of the new Fraunhofer IPM Institute was marked on 4 July, 2017,…

News
Appointment of Dr Sven Huismann as authorized signatory

With effect from 1 July 2017, Dr (in Technology) Sven Huismann was given joint power of signatory for the company.

Dr Huismann has been working at…

News
30 years of KREBS+KIEFER in Karlsruhe

On 1 April 1987, the first branch of KREBS+KIEFER was opened in Karlsruhe. At the same time, KREBS+KIEFER Ingenieure GmbH, with headquarters in…

News
Deutsche Amphibolin-Werke: Inauguration of the new company head-quarters

Over the last three years, DAW SE (Deutsche Amphibolin-Werke) in Ober-Ramstadt has been building a new company headquarters for more than 170…

News
Commissioning of KREBS+KIEFER for the exciting large-scale project FOUR in Frankfurt am Main

Commissioning of KREBS+KIEFER for the exciting large-scale project FOUR in Frankfurt am Main
On the former Deutsche Bank-area between Rossmarkt,…

News
Start of construction for the Netratal Bridge at Sontra/Eschwege

The Netratal Bridge is part of the new construction project of the A44 from Kassel to Herleshausen and crosses above the Netratal and the B7. In June…

News
High-ranking visitors from China in Niederfinow

On 30 May 2017, KREBS+KIEFER had the pleasure of welcoming a high-ranking company delegation from China to the construction site of the new…

News
Ground-breaking ceremony for the Güntzareal in Dresden

On 23 May 2017, construction work for the extension building to the headquarters of the Ostsächsische Sparkasse Dresden bank began with the symbolic…

News
Laying of the foundation stone for the new Mainz Archaeological Centre building

After completing the excavation pit and removing the remaining historical stonework, on 5th May 2017 there was a celebration for the laying of the…

News
Dr. Sören Mueller to give a lecture at NANODUR Dyckerhoff

On 3 May 2017, the "10 years NANODUR Concrete" anniversary event took place at Dyckerhoff in Kirchheimbolanden. As an outstanding KREBS + KIEFER…

News
Kienlesberg Bridge Move in Ulm Successful

With the latest of the eleven moves and the hoisting of the twelfth section on 29 April 2017, the shunting operation of the construction for the new…

News
German Construction Technology Day 2017 with KREBS+KIEFER

Dialogue. Innovation. Quality.

Under these inspirations, between 26 and 27 April 2017, around 1,500 visitors took part in the Congress of the German…

News
Opening of the terminal of the rolling motorway in Freiburg im Breisgau

After completion of a construction phase lasting around 18 months, the opening of the modernised terminal of the Rolling Motorway (Rola) in Freiburg…

News
Dresden Bridge Construction Symposium 2017

On 13 and 14 March 2017, the 27th traditional bridge building symposium took place at the Technical University of Dresden. With around 1,250…

News
Ground breaking ceremony for the new construction of the Armed Forces Technical School in Karlsruhe

A symbolic, ground breaking ceremony on the 9th March marked the beginning of construction works for the new building of the tradition-rich, Armed…

News
Hessen Fire Protection Day 2017 in Neu-Isenburg

On 28 March 2017, architects, planners and those involved in planning met in the Hugenottenhalle in Neu-Isenburg at the Hessen Fire Protection Day so…

News
Ulrich Finsterwalder Civil Engineering Award 2017

On 10 February 2017 the shiplift at the Three Gorges dam, China received a prize as part of the 15th Civil Engineering Award 2017. Thanks to the…

News
Meeting of the experts responsible for bridge load assessment (FvBel) of the German Railways (DB) from 25/01/2017-26/01/2017 in Fulda

To this year's meeting of the experts responsible for bridge load assessments KREBS+KIEFER was invited by DB (German Railways) Network AG to deliver a…

News
Erfurt arena opened

On 22 January 2017, it finally came to pass! Two years after the start of the structural alterations to the venerable Steigerwaldstadion in Erfurt,…

News
KREBS+KIEFER FRITZ AG, founded in Darmstadt

On 1 January 2017, KREBS+KIEFER FRITZ AG opened its Darmstadt office. KREBS + KIEFER FRITZ AG is the company which has been formed from the merger of…

News
Appointment of Mr Fabian Ruhl as Managing Director

Dr.-Ing. Fabian Ruhl is assuming the role of managing the construction management division in Darmstadt effective as of 01 January 2017.

This is…

News
Mr Andreas Freitag appointed to the Board in Wurzburg

KREBS+KIEFER congratulates Mr Andreas Freitag on his appointment to the Board of IRS Stahlwasserbau Consulting AG. Starting from 1 January 2017, Mr…

News
Dipl.-Phys. Peter Fritz appointed to the KREBS+KIEFER FRITZ AG management board

With effect from 1 January 2017, Dipl.-Phys. Peter Fritz took up his position as a member to the newly established KREBS+KIEFER FRITZ AG management…

News
KREBS+KIEFER Erfurt has opened new offices

In the summer of 2016, it finally happened. The Erfurt branch of KREBS+KIEFER moved into new, extensively converted offices in Weimarische Straße. The…

News
A distinction for Mr. Tarik Tiyma

On 6 December 2016, B.Eng. Tarik Tiyma was honoured with the 2016 'award for studies' from the 'Friends of FH Erfurt e. V.'. Mr. Tiyma has supported…

News
FIDIC INTERNATIONAL CONTRACT USERS’ CONFERENCE in London

This year KREBS+KIEFER was once again represented at the FIDIC INTERNATIONAL CONTRACT USERS’ CONFERENCE in London on the 6th and 7th of December 2016.…

News
Foundation stone laying for new vocational training and technology centre in Trier

The foundation stone of the new vocational training and technology centre of the Trier Chamber of Crafts was laid on 7 December 2016.

The sinking of a…

News
Katharina Weinz MSc appointed as Head Engineer at KREBS+KIEFER Dresden

The new Head of Engineering for the structural physics division at our Dresden branch, Katharina Weinz MSc, was appointed on 01 December 2016.

News
KREBS+KIEFER called upon as fire safety experts for the “Spandauer Ufer” workshop procedure

Dr Huismann was appointed by the project developers of the “Spandauer Ufer” project as an expert in preventive fire safety as part of the urban…

News
COMPARISON MEASUREMENT FOR VMPA NOISE INSULATION INSPECTION AUTHORITIES SUCCESSFULLY PASSED

Our employees, Alexander Pöhler, Julia Lutz and Tanja Adelmann-Klug of KREBS+KIEFER Ingenieure GmbH Darmstadt successfully took part in comparison…

News
SHOW MUST GO ON – Reopening and inauguration of the new stage technology at the DRESDEN PLAYHOUSE

At the end of October 2016, the Dresden Playhouse celebrated the resumption of its theatre programme with new and modern stage technology. During an…

News
Symposium on Sustainable Bridge-strengthening at Karlsruhe University of Applied Sciences

The preservation and sustainable strengthening of bridge structures for increased traffic volumes is currently one of the greatest challenges in…

News
Topping out ceremony for the Centre for Advancing Electronics Dresden (cfaed) at the Technical University of Dresden

After a construction period of around one year, the topping-out ceremony for the construction of the Centre for Advancing Electronics Dresden (cfaed)…

News
Escape, Displacement, Reconciliation Foundation celebrates topping out ceremony

On Monday 17 October 2016, the Escape, Displacement, Reconciliation Foundation cel-ebrated the topping out ceremony of the Deutschlandhaus together…

News
KREBS+KIEFER develops a certification system for sustainable residential buildings of the CG Group

In September 2016 René Horschig was invited for the second time by the K+K Dresden office to give a talk on the subject of the “Development of a…

News
19th IABSE Congress - Stockholm 2016: KREBS+KIEFER out in force at the world congress for bridge and structural engineering

The congress of the ‘International Association of Bridge and Structural Engineering’ (IABSE) took place between 21-23 September 2016 in Stockholm.…

News
A trial operation of the world's largest ship lift is underway at the Three Gorges Dam

18 September 2016 saw the start of the official trial operation of the ship lift for traffic passing through China's Three Gorges Dam. With a lifting…

News
10 Years of KREBS+KIEFER Dresden

10 years of KREBS+KIEFER in Dresden? Yes – it’s been ten whole years since Dr Richard Stroetmann, professor at TU Dresden was appointed, thereby…

News
‘Movement-Construction Site-Education-Being Together’ - BIKE EXCURSION KREBS+KIEFER South

On 12 September 2016, the weather was kind to the employees of the KREBS + KIEFER branch offices in Karlsruhe, Freiburg, Stuttgart and Munich: At…

News
KREBS+KIEFER at the EXPO REAL 2016

This year, as every year, KREBS+KIEFER is represented as a stand partner at the EXPO REAL, the largest European trade fair for commercial property…

News
Hansabrücke Herford – Installing the box girder

On 4 August and 5 August 2016 the installation of the first two box girders of the new superstructure on Hansabrücke Herford took place, which is…

News
Appointment of Mrs Adelmann–Klug as Managing Engineer at KREBS+KIEFER in Darmstadt

The management is very pleased to report that Mrs Tanja Adelmann–Klug has been appointed as Managing Engineer in the area of Structural Physics with…

News
KREBS+KIEFER celebrates the fifth anniversary of the opening of its Mainz office

With its open day on 7 July 2016, the Mainz office on Ludwigsstraße celebrated its fifth birthday.
A large number of guests responded to our invite -…

News
Mr Dipl.-Ing. (FH) Lutz Windmüller obtains certification as an expert in building protection and renovation

In the course of a six-month specialist training course, culminating in the examination as certified expert for building protection and renovation, Mr…

News
01/07/2016 - Opening New Building For State Museum Schwerin

After only about 1 ½ years of building, the opening ceremony for the museum extension can finally take place.

In the new building, the museum has about…

News
Celebratory Inauguration of the Laboratory and Research New Building 6 on 22/06/2016 on the Wismar University Campus

In building 6, for the area of structural engineering of the Faculty of Engineering Sciences and for the construction skill centre for…

News
Appointment of Mr Dipl.-Ing. Thomas Brugger as Leading Engineer and Branch Manager at KREBS+KIEFER Stuttgart

The company KREBS+KIEFER Karlsruhe is happy to be able to appoint Mr Dipl.-Ing. Thomas Brugger as Leading Engineer and Branch Manager at KREBS+KIEFER…

News
Appointment of Mr Dipl.-Ing. Udo Hoffmann as Leading Engineer at KREBS+KIEFER Karlsruhe

The KREBS+KIEFER Karlsruhe management is pleased to be able to appoint our colleague of many years Udo Hoffmann as Leading Engineer in the Building…

News
Dipl.-Ing. (FH) Mr Timo Weidner Has Been Appointed as Leading Engineer at KREBS+KIEFER Darmstadt

Our employee Mr Timo Weidner has been appointed as Leading Engineer on 01 July 2016.

Mr Weidner has acquired and managed successfully numerous projects…

News
Appointment of Mr Christian Gabel as Managing Director

Mr Christian Gabel has been appointed on 01/07/2016 as Managing Director of our Berlin company.

With this step, we are consistently pursuing the steady…

News
Opening of the Mannheim North light rail system

The Mannheim North light rail system was opened on 11.06.2016. This new light rail connection completes the 6.4 km stretch covering the districts of…

News
Construction of the Rastatt Tunnel officially starts

On 25.05.2016, the mining work for the Rastatt Tunnel officially began in the presence of numerous prominent figures. The tunnelling under the town of…

News
Teubert Bridge – Worth preserving?

In the Berlin borough of Tempelhof-Schöneberg, the Teubert Bridge carries the ring road across the Teltow Canal (TeK) at the 21.696 km point. The main…

News
1st Hessian Fire Safety Day - KREBS+KIEFER involved with the organisation and moderation

On 27 April 2016, Peter Bitsch, the Vice-President of the Hessian Chamber of Architects and Town Planners, opened the 1st Hessian Fire Safety Day in…

News
Appointment of Mr Ludger Loers, Dipl.-Ing., as General Manager in Cologne, Germany

Mr Ludger Loers, Dipl.-Ing., is granted collective power of attorney for KREBS+KIEFER Ingenieure GmbH in Cologne as of 1 May 2016. Mr Loers will…

News
CBBM Lübeck officially opened

On 26 February 2016, the international research centre, the "Center of Brain, Behavior and Metabolism" (CBBM) was officially opened in Lübeck.

Three…

News
Topping-out ceremony for the construction of annexe 2 of the Fachhochschule Potsdam on 03 March 2016

After completion of annexe 1 to the laboratory and workshop building in August 2013, annexe 2 represents the fourth new building on the…

News
Johannes John Dipl.-Ing. receives the Enno Heidebroek Certificate from Dresden University of Technology

Johannes John Dipl.-Ing. receives On 11 December 2015, in a special ceremony in the Festival Hall in Dülferstraße, the best graduates from Dresden…

News
St. Gangolf resplendent again: A renovation project reaches its final stages in Trier

With the removal of the scaffolding, the extensive renovation of St. Gangolf market church in Trier, which received a lot of attention in the city and…

News
Sören Müller has been awarded a Doctorate of Engineering (Dr.-Ing.)

On 5 February 2016, Sören Müller was awarded the academic degree of Doctor of Engineering (Dr.-Ing.) from the Faculty of Civil Engineering at the…

News
KREBS+KIEFER opens a new branch in North Rhine-Westphalia: integration of the Cologne-based company Jeromin+Vester

KREBS+KIEFER has been represented in North Rhine-Westphalia since 1 January 2016. From now on, this is where the skills and know-how of the companies…

News
Recognition as a verification engineer for structural design in the specialisation of solid construction for Dipl.-Ing. Steffen Böhm and appointment as managing partner

We are pleased to announce that Dipl.-Ing. Steffen Böhm has received his admission as a verification engineer in the specialisation of solid…

News
Rhine Bridge Schierstein – Floating into position and lifting the middle piece

On the Schierstein bridge between Wiesbaden and Mainz, the middle piece was floated into position over the Biebrich arm of the Rhine and then lifted…

News
Poster party of the tunnel bore for the Karlsruhe combined solution

On 19 January 2016, among the active participation of invited guests and project participants, the poster party took place for the Karl-Friedrich…

News
Roofing ceremony for the newly constructed administrative centre in Freiburg

On 17 December 2015, the roofing ceremony for the 5-storey shell of the central administrative centre in Freiburg, with its associated day-care…

News
Conversion of the Erfurt Steigerwald stadium into a modern multi-purpose arena

Construction work has been proceeding on the grounds of the Steigerwald stadium in Erfurt since 05 January 2015. Based on the plans of HPP architects…

News
Traffic release of Erfurt – Halle/Leipzig high-speed railway

On 13 December 2015, the route of the Erfurt – Halle/Leipzig high-speed railway, costing approximately EUR 3 billion, was inaugurated in the presence…

News
Dipl.-Ing. (FH) Mr Torsten Brüggemann and Dipl.-Ing. (FH) Mr Alwin Hoffmann become senior engineers at KREBS+KIEFER Mainz

On 01 January 2016, our Mainz employees Torsten Brüggemann and Alwin Hoffmann were appointed the role of Senior Engineer.

Mr Brüggemann successfully…

News
Appointment of Dipl.-Ing. (TU) Rene Horschig as an authorised representative

Dipl.-Ing. (TU) Rene Horschig is granted collective power of attorney as of 01 January 2016.

Rene Horschig has been working in the field of structural…

News
Safety in underground traffic facilities: Learning from experience

On the occasion of its annual Fire Chiefs’ Forum, the International Fire Academy discussed and presented its training methods to selected industry…

News
New link road brings relief to Gera-Liebschwitz

Since mid-August 2015, the new link road of the L1082n has been providing relief to the Gera district of Liebschwitz in Germany from through traffic.…

News
Ground-breaking ceremony for the gap closure of the B 6n

On 30 November 2015, the Federal Transport Minister Alexander Dobrindt, together with the Minister for Regional Development and Transport of…

News
Tunnel construction experience of KREBS+KIEFER Korean engineers at KREBS+KIEFER

On 07 December 2015, engineers from Korea visited the Berlin office of KREBS+KIEFER. The employees from the Seoul Metropolitan Government and…

News
Opening and ceremonial handover of the new building of the Berufsbildende Schule II in Kaiserslautern

On 1 December 2015, after a planning and construction period spanning almost four years, the new building of the BBS II was opened in a ceremony…

News
The Lichtwiese railway in Darmstadt – Information event for the public with the participation of KREBS+KIEFER

As participants in the project management contract for the Lichtwiese railway in Darmstadt, KREBS+KIEFER is involved in the preparation,…

News
The new ship lift in Niederfinow enters the final stage of assembly

With the assembly of the counterweights for the new ship lift at Niederfinow, we are now entering one of the most spectacular phases of the…

News
25 years for the Chamber of Engineers in Baden-Württemberg; KREBS+KIEFER attended the engineers’ day and celebrations

On 18 November 2015, the Chamber of Engineers in Baden-Württemberg celebrated its 25th anniversary at festivities attended by a number of prominent…

News
Ground-breaking ceremony for noise abatement measure in Ditzingen

In the presence of numerous well-known individuals, the symbolic start of construction for the noise abatement wall in Ditzingen, Germany, took place…

News
KREBS+KIEFER covered the topic of “Sustainable Bridge Construction” in a presentation at the IABSE Symposium 2015 in Geneva

“Solutions for global challenges” was the motto of this year’s symposium of the International Association for Bridge and Structural Engineering, which…

News
It’s all systems go on the A 10!

On 7 October 2015, the stretch of the A 10 Nordring state motorway around metropolitan Berlin, which has now been expanded to six lanes, was opened to…

News
1 October 2015: Fire Safety Department established at KREBS+KIEFER in Darmstadt

With immediate effect, we will also have an experienced team for all services related to preventive fire safety in Darmstadt, Germany. With a total of…

News
KREBS+KIEFER at Expo Real

Also this year, KREBS+KIEFER will once again be represented as a stand partner at Expo Real.

KREBS+KIEFER will be represented in the university town of…

News
Excursion to the underworld

The geology of the largest karst area in Germany, the Schwabian Alb, was the focus of this year’s works outing for the southern branches of…

News
A day trip to Leipzig – and no one was taken for a ride!

This was the motto of our charming tour guide on our work outing to Leipzig on 17.09.2015. Even before the tour of both historically prized buildings…

News
Ground-breaking ceremony at bERLinPro

On 10.09.2015, the symbolic "first cut with a spade" took place at the building shell that is to accommodate the first testing facility in the world…

News
Karlsruhe turns 300 and keeps on growing – KREBS+KIEFER is there to help celebrate!

Karlsruhe was founded as a residential city in 1715 by Margrave Carl Wilhelm von Baden-Durlach. The city and its citizens are celebrating the…

News
When competence protects lives: The new Director for Fire Safety is Prof. Dr.-Ing. Ulrich Dietmann

Prof. Dr.-Ing. Ulrich Dietmann With retroactive effect to 1 September 2015, Prof. Dr.-Ing. Ulrich Dietmann has been appointed as a director at…

News
Success with the underground tramway in Karlsruhe

On 7 September 2015 at 10.30 a.m., it finally arrived. The tunnel-boring machine named “Giulia” had penetrated the last seal wall with its cutting…

News
Staatliches Museum Schwerin: topping-out ceremony for the museum extension

“The museum has to grow, so that the past has a future”. With this mission statement of the friends of Staatliches Museum Schwerin e. V., the…

News
Opening of the tram line stop at Berlin Central Station

After a hiatus of almost half a century, there will shortly once again be a tramline running along Invalidenstraße in Berlin, which links the western…

News
FRANKLIN Mannheim: KREBS+KIEFER awarded professional services contract for construction site clearance, building logistics and safety management

The city of Mannheim, represented by the development company MWSP, will acquire the Benjamin Franklin Village, which has an area of around 144…

News
Appointment of Mr Michael Schanzenbach Dipl.-Ing., as Managing Director in Darmstadt

With retroactive effect to 1 July 2015, Mr Michael Schanzenbach Dipl.-Ing. was appointed Managing Director of KREBS+KIEFER Ingenieure GmbH in…

News
The award from the Board of Governors at the University of Applied Sciences in Mainz goes to Mr Brucker

On 16 July 2015, our student colleague Mr Sven Brucker, B. Eng. and two of his fellow students, received the award from the Board of Governors at the…

News
Construction as a way of connecting vision and reality

On 23 June 2015, as part of a VDI event for the Berlin-Brandenburg district association, an audience of students and up-and-coming engineers followed…

News
Appointment of Mr Brian Sorg Dipl.-Ing. (TU) as General Manager in Leipzig, Germany

Mr Brian Sorg Dipl.-Ing. (TU) was appointed as General Manager as of 1 July 2015. Looking to the future as a member of the management team at…

News
Appointment of Mr Sven Schneider Dipl.-Ing. as General Manager in Dresden, Germany

Mr Sven Schneider Dipl.-Ing. was appointed General Manager as of 1 July 2015. In the future, he will support the management team at KREBS+KIEFER GmbH,…

News
Opening of the World Conference Center (WCCB) in Bonn, Germany

On 7 June 2015, the World Conference Center in Bonn was officially opened as part of a UN climate conference. The guests of honour included the UN…

News
At the company fun run in Dresden, more KREBS+KIEFER runners at the start line than ever before

On 3 June 2015, the annual REWE team challenge was held in Dresden once again. At the seventh incarnation of this event, there were twenty eager…

News
Opening of Bothmer Palace in Klütz

After a construction period totalling seven years, this year's Whit Saturday, on 23 May 2015, saw the ceremonial opening of the main building and east…

News
The Kurt-Beyer Prize, established by HOCHTIEF, goes to Dr Laura Ritter

On 22 May 2015, Dr Laura Ritter from our Dresden office became the 43rd recipient of the Kurt-Beyer Prize, which was established by HOCHTIEF and has…

News
Live (experience) more – Architecture Day 2015

At this year's Architecture Day on 27 and 28 June 2015 in Rhineland-Palatinate, 70 selected projects under the theme of "Architecture is here to stay"…

News
KREBS+KIEFER takes part in 2015 German Construction Engineering Day in Düsseldorf

The German Construction Engineering Day, with around 1,200 registered participants, took place on 23 and 24 April 2015 at the CCD Congress Center in…

News
VISION student competition — Award presentation on 21/04/2015

The Chamber of Engineers in Hesse, Germany has been organising student competitions in collaboration with other Chambers of Engineers for some years…

News
KREBS+KIEFER involved with citizen information about the Seetor crossing in Radolfzell

On 1 April there was a citizen information event in Radolfzell regarding the Seetor crossing, a connection between the lake front and the historic old…

News
The Second Young Engineers Colloquium of the German IABSE group in Stuttgart: KREBS+KIEFER strongly represented

On 23 March, the Second Young Engineers Colloquium of the German group of the International Association for Bridge and Structural Engineering (IABSE)…

News
Laying the foundation stone in Freiburg: newly constructed administrative centre

After the end of the existing provisional arrangements for the Technical Town Hall dating from 1967 and the excavation of the construction pit, 18…

News
KREBS+KIEFER win the Special Award “Building of the Year 2013 of the Magdeburg Architects and Engineer Association.

On 1 November 2014, the Special Award “Building of the Year 2013” was awarded to the engineering office KREBS+KIEFER Ingenieure GmbH in Darmstadt in a…

News
Dresdner Stahlbaufachtagung (Dresden Steel Construction Conference) on 26 March 2015: Steel and composite structures in civil engineering and bridge construction

This year’s Dresdner Stahlbaufachtagung includes the key issues of multi-storey building in steel and composite construction, roof and wall systems in…

News
Relocation of the Hamburg Branch

The Hamburg branch of KREBS+KIEFER Ingenieure GmbH is moving on 16 January 2015. Due to the in-crease in personnel, the office space in Altstädter…

News
Topping-out ceremony in Forchheim — New office and re-search building for Siemens Healthcare

After a construction period of around 16 months, the topping-out ceremony for the new Siemens Healthcare office and research building was celebrated…

News
16th planning section of the B 6n at Köthen open to traffic

With the symbolic cutting of the tape on Tuesday, 16 December 2014, the 16th planning section of the B 6n, the Köthen ring road, was opened to road…

News
Mr Thomas Reinke has been awarded a Doctorate of Engineering (Dr. Ing).

Mr Reinke was awarded the Doctorate on 28 November 2014 after passing the doctoral examination by the Faculty for Construction Engineers, Geo and…

News
Mr Sebastian Meurer achieves the "Refurbishment Designer" qualification

During a ten-month training programme, which ended with the exam for "Certified Refurbishment Designer", Mr Sebastian Meurer has proven his knowledge…

News
"Scaffolding" Seminar Representatives from KREBS+KIEFER contribute their expertise

On 14 and 15 November 2014 the "Scaffolding" seminar, organised by the two largest German scaffolding associations Güteschutzverband Stahlgerüstbau…

News
Careers in the region – students meet employers

For the third time, the city of Mainz's Economic Affairs department, in cooperation with Mainz High School and the Johannes Gutenberg University, was…

News
Entry into the Federal Development Programme's Energy Expert list

The Federal Ministry as well as the Kreditanstalt für Wiederaufbau (KfW) demand additional qualifications for experts in heat loss as well as entry…

News
The Karlsruhe combined solution: Poster Party in October 2014

The Poster Party for the tunnel construction work under Karlsruhe’s Kaiserstraße was held on the afternoon of Saturday 25 October 2014 in glorious…

News
Weinberg Bridge opened over the Havel river in Rathenow

Under intense public interest, the Weinberg Bridge in Rathenow was opened and named on 15 October 2014. The 348m long footbridge serves as a way of…

News
The Karlsruhe combined solution: Tunnel boring machine (TBM) largely completed

As part of a construction project being led by Mr Peter Müller, KREBS+KIEFER Ingenieure GmbH, Karlsruhe, employees working at the Karlsruhe site were…

News
KREBS+KIEFER at the Expo Real 2014 in Munich

The seventeenth International Trade Fair for Property and Investments took place in Munich between 6 and 8 October 2014. This trade fair is held every…

News
Extension construction of the national museum in Schwerin 1. Ground-breaking ceremony

The building of the exhibition building started formally with the ground-breaking ceremony on the 30th of November, 2014. In the newly constructed…

News
Renovation and extension of the memorial site of the Berlin Wall completed

Punctually, with the approaching 25th anniversary of the fall of the Berlin Wall in November of 2014, the renovation and extension of the…

News
WE THINK FURTHER IN ALL DIRECTIONS
News
Tunnel safety in the planning, construction and operation phases and during retrofitting

In the spring of 2014, we were designated by DEGES as the safety officers during the planning, construction and commissioning phases of the three…

News
Starting of school instruction in Marie-Curie Gymnasium in Dresden

With the start of the new school year, the students and teachers of the Marie-Curie Gymnasium could resume their lessons in the new school complex…

News
IABSE Symposium Madrid 2014: KREBS+KIEFER present on many fronts

This year, at the 37th Symposium of the International Association for Bridge and Structural Engineering, or IABSE for short, taking place from the 3rd…

News
Foundation laying ceremony of "The Fontenay" in Hamburg

In Hamburg, directly on the outer Alster on the property of the former Intercontinental Hotel, a new luxury hotel is currently under construction, and…

News
Dipl.-Ing. Aleksandra Uhlig achieves certification as a passive house planner

In the course of a three-month advanced training program leading to an examination for the qualification of certified passive house planner, Ms.…

News
Dipl.-Ing. (FH) Peter Müller is appointed Authorized Signatory in Karlsruhe

With effect from 1st July 2014, Dipl.-Ing. (FH) Pe­ter Mül­ler has been appointed Authorized Signatory. In this role, he will support the senior…

News
K+K Darmstadt again takes part in J.P.Morgan race

On 11th June 2014, 22 colleagues from Krebs und Kie­fer Darm­stadt took part in the world’s largest inter-company race, the JPMor­gan Cor­po­rate…

News
Topping-out ceremony for St. Martin Towers in Frankfurt

The topping-out ceremony for St. Martin Towers took place on Thursday 5th June 2014 after around a year and a half of construction.

After the event…

News
Kantgaragen-Palast in Berlin – structural analysis of Europe’s oldest multi-storey parking facility

The Kant­ga­ra­gen-Pa­last, built between 1930 and 1936 and listed as a historic building monument since 1991, is Europe’s oldest multi-storey parking…

News
Karlsruhe, city of construction sites – information tours on municipal projects

It‘s impossible to ignore: construction is in progress everywhere in Karls­ruhe. The „U-Strab“ tramway tunnel and the city’s 300th birthday…

News
Dipl.-Ing. Bernd Reister is appointed Leading Engineer at KREBS+KIEFER Karlsruhe

With effect from 1st April 2014, Dipl.-Ing. Bernd Reis­ter has been appointed Leading Engineer in the area of building construction at our Karlsruhe…

News
Naming ceremony for Cannstatt long-distance railway tunnel

Cannstatt long-distance railway tunnel is part of the major Stutt­gart 21 / new Wend­lin­gen-Ulm railway line project, in which the railway hub in…

News
Dr. Röhner is head of our office in Hamburg

Dr. Rita Röhner has been head of our office in Hamburg since 1st February 2014. Her objective is to further establish and strengthen our Hamburg…

News
Dr. techn. Sven Huismann is appointed Leading Engineer

The management team is pleased to announce that Dr. techn. Sven Huismann has been appointed Leading Engineer with effect from 1st March 2014.

News
Ehrensenator-Huber-Preis awarded by Karlsruhe Institut für Technologie (KIT) faculty of civil engineering, geosciences and environmental science goes to Ms. Mirka Maurer

On 7th February 2014, the Ehrensenator-Huber-Preis was awarded to Ms. Mirka Maurer in recognition of her outstanding performance during her studies…

News
Wustermark station is now barrier-free

After a construction period of only six months, the new barrier-free access to the platform at Wustermark station in the Havelland district was…

News
Dipl.-Ing. Susan Herrmann becomes a Managing Partner

The partners’ meeting of Krebs und Kie­­fer & Part­­ner (KKP) has accepted Dipl.-Ing. Su­san Herr­mann into the circle of Managing Partners with…

News
K+K patronage of tri-national course in Civil Engineering reaches successful conclusion

In Oc­to­ber 2010, 24 students from Germany, Franc­e and Switzerland took up a joint course of studies in Civil Engineering in France (Uni­ver­sité de…

News
Blue emergency lights instead of flickering candles ...

... for more than 80 police, fire services and rapid response personnel in Bautzen on 14th Decem­ber 2013. The scenario for the exercise: in the west…

News
Güterfelde bypass goes into operation a year early

After only three years of construction - one year earlier than planned - the Güterfelde bypass was opened to traffic on 16th Decem­ber 2013. This 3,9…

News
Ground-breaking ceremony for new judicial center in Bad Kreuznach

After several years of planning, construction work on this project officially began with the symbolic ground-breaking ceremony on the site at the…

News
Overall safety concepts (RABT) for 20 road tunnels in the city of Cologne

The tunnel safety department of KREBS+KIEFER Beratende Ingenieure GmbH has been commissioned to produce the overall safety concepts (RABT) …

News
"Lindwürmer" daycare center on the campus of FH Worms is officially opened

After only a year of construction, the „Lind­wür­mer“ daycare center on the campus of FH Worms was officially opened on 11th No­vem­ber 2013.…

News
„Green light for tunnel safety“ at KREBS+KIEFER

At the moment, the traffic lights on the A 1 motorway in front of the noise protection enclosure at Köln-Lö­ve­nich still show red at night, so that…

News
Topping-out ceremony for the extension of Vocational School II in Kaiserslautern

Following completion in recent months of the building shell for the first construction phase of Vocational School II for…

News
Ground-breaking ceremony for the replacement railway bridge over Weiherfeldstraße in Karlsruhe

With the ground-breaking ceremony performed on 27th Sep­tem­ber 2013 by the mayor of Karls­ru­he responsible for construction Mi­cha­el Obert, head…

News
Monorail for Luxemburg – K+K presents the result of the study of alternatives

Due to the increasing numbers of workplaces in the city of Lu­xemburg which have led to increasing numbers of commuters from France, the access…

News
Full steam ahead on the Oder-Spree Canal

After three years of construction work, Kersdorf lock, one of four locks on the Oder-Spree canal, was opened for navigation on 4th Sep­tem­ber 2013.

Th…

News
Structural inspection of the old ship lift at Niederfinow is completed

As part of its duty to ensure transportation safety, the water and navigation authority bears responsibility for structures on the federal waterways.…

News
Waldschlößchenbrücke over the River Elbe in Dresden is opened to traffic

On 26th August 2013, in glorious sunshine, the Wald­schlöß­chen­brü­cke was opened to traffic. Its construction took 6 turbulent years, during which…

News
Completion of structural work for extension to Marie-Elisabeth-Lüders building

On 26th Au­gust 2013, the building construction department of our Berlin office visited the site of the extension to the Ma­rie-Eli­sa­beth-Lü­ders…

News
Second section of B 454 road in Stadtallendorf is opened to traffic

On Wednesday 14th August, just in time for the end of the school summer holiday in Hessen, the second section of the lowered B 454 road in…

News
Breakthrough in Branich tunnel in Schriesheim

After around 18 months, the Branich tunnel mining team has succeeded in driving the crown of the tunnel through to its eastern portal. On 1st August…

News
Opening of Vicco-von-Bülow Gymnasium in Stahnsdorf

On 5th Au­gust 2013, in time for the start of the new school year, the Vicco-von-Bü­low Gymnasium (grammar school) in Stahns­dorf was officially…

News
Official naming ceremony for tunnel on underground line U 5 in Berlin

On 20th June 2013, the official ceremony during which the future underground railway tunnel was given the name "Char­lot­te" took place in the 17 m…

News
Ground-breaking ceremony for 16th section of Berlin city motorway A 100

With the ground-breaking ceremony on 8th May 2013 performed by Federal Minister of Transport Pe­ter Rams­auer (CSU) and Berlin’s senator for transport…

News
Official opening of CampusOne at Hochschule für Musik Karlsruhe

The official opening ceremony for the campus of Hoch­schu­le für Mu­sik Karls­ru­he took place on 25th April 2013. The facilities of the university…

News
Structural reinforcement of ATC tower at Frankfurt-Hahn Airport

This air traffic control tower was built in 1951 on the NATO Air Base at Hahn which was formerly operated by the US Air Force. Over time, the steel…

News
THE SQUAIRE wins MIPIM Award 2013

THE SQUAIRE complex developed by IVG at Frankfurt Airport enjoyed outstanding success at this year’s MIPIM in Cannes and won the “Oscar of the real…

News
KREBS+KIEFER accompanies ministerial delegations to Algeria

Dr. Nils Schmid, Deputy President and Minister for Finance and Economic Affairs of the State of Baden-Würt­tem­berg, visited Algiers from 3rd to 6th…

News
Opening of the first construction phase of the main fire station in Freiburg

With its official opening by Mayor of Freiburg Dieter Salomon on 19th December 2013, the first construction phase of the main fire station in Freiburg…

News
Topping-out ceremony for primary school with daycare center in Frankfurt-Riedberg

A new district, Frank­furt-Ried­berg, is currently being built in the north of Frankfurt. In the long term, it will offer residential accommodation…

News
Official handover of the new student residence in Wildau

On 22nd No­vem­ber 2012, the new student residence was officially handed over to its owners, Stu­den­ten­werk Pots­dam. This means that the new…

News
Celebration at the Branich tunnel in honor of St. Barbara

4th December was a special day for the builders of this tunnel. They did not work on this day but instead held a celebration in honor of their patron…

News
Official opening ceremony for Katzenberg tunnel on the new and improved Karlsruhe – Basel railway line

On 4th December 2012, the imminent start of operations of the Katzenberg tunnel with the timetable change on 9th December was celebrated in advance…

News
3rd place in a competition to improve Messe Essen

As specialist advisers to HPP Ar­chi­tects, Düs­sel­dorf, Krebs und Kie­fer won a prize in the two-stage competition to improve the Messe Essen trade…

News
1st prize in competition "Kultur- und Veranstaltungshaus Weikersheim"

Together with Munich-based architects HENN, landscape architects Nowak and other participants in the planning process, KREBS+KIEFER won the first…

News
Topping-out ceremony for the new sales headquarters of Mercedes-Benz Germany in Berlin

A new administrative center is currently being built for Mercedes-Benz Sales Germany on the banks of the River Spree in Berlin. The jointless complex,…

News
KREBS+KIEFER joins waterway engineering association IWSV

Since the middle of this year, KREBS+KIEFER has been a member of IWSV (In­ge­ni­eur­ver­band für Was­ser- und Schiff­fahrts­ver­wal­tung – association…

News
Cornerstone of the Porta building on the MainTor site is laid

On 29th August 2012, the cornerstone of the first new building on the former Degussa site between Untermainkai and Neue Mainzer Straße in Frankfurt…

News
New ship lift in Niederfinow: current status of construction

The oldest ship lift which is still in operation, the ship lift at Niederfinow (built in 1934) is situated roughly halfway along the canal connecting…

News
A 60 motorway near Hechtsheim is open to traffic

The A 60 "Main­zer Ring" federal motorway was permanently opened for traffic on Friday 10th August 2012. Guests at the official celebration were…

News
KREBS+KIEFER now specialize in hydraulic steel construction: IRS joins the K+K Group

With the integration of Ingenieurbüro Rapsch und Schubert Stahlwasserbau Consulting GmbH (IRS), Würzburg, into the K+K group of companies,…

News
Unstruttal viaduct – Germany’s second longest railway bridge

On 6th July 2012, the completion of the Unstruttal viaduct was celebrated in Karsdorf (Burgenlandkreis) in the state of Sachsen-Anhalt. After five and…

News
Topping-out celebration at Gymnasium Stahnsdorf

On 15th June, the topping-out celebration took place at the new Gymnasium (secondary school) in Stahns­dorf. Now that the sports hall is already being…

News
Germany’s largest wildlife crossing as a timber construction

From 15th June 2012, 25 heavy load trucks started to deliver the prefabricated laminated beams and plywood panels for Germany’s largest wildlife…

News
Topping-out celebration in the southern gatehouse of the Neue Palais in Potsdam

On Friday, 15th June 2012, the Prussian Palaces and Gardens Foundation Berlin-Brandenburg (SPSG) held a topping-out celebration in the 243-year-old…

News
Noise protection program at Frankfurt Airport: Expert reports / acoustic assessments

Under the Frankfurt Airport noise protection program, KREBS+KIEFER Ingenieure GmbH Darm­stadt carries out the acoustic assessments required by persons…

News
Official opening of the biomedical research center at Seltersberg (BFS) in Gießen

On 21st May 2012, the Sel­ters­berg biomedical research center (BFS), which forms part of Justus-Liebig-Universität Gie­ßen, was officially opened.…

News
Demolition work on the MainTor site officially completed

On 15th May 2012, the demolition work that started last year on the former Degussa site between Untermainkai and the Kar­me­li­ter­klos­ter…

News
Ground-breaking ceremony for 5th chamber of Brunsbüttel lock

The ground-breaking ceremony for the new chamber of the lock system at Brunsbüttel took place on 17th April 2012 in the presence of Federal Minister…

News
Opening of the Zentrale Kunstdepot in Freiburg

After 16 months of construction, the new Zentrale Kunstdepot (central art storage building) in Freiburg im Breisgau was handed over to its users…

News
Technische Universität Dresden – new Technikum building in Nöthnitzer Straße: topping-out ceremony in April 2012

On 27th April 2012, all those involved in the planning and construction of the Technikum building in Dresden’s Nöthnitzer Straße gathered to celebrate…

News
Light show on the TaunusTurm site in Frankfurt am Main

Tishman Speyer Properties Deutschland GmbH took part in the Luminale 2012 lighting culture festival in Frankfurt am Main with a light show over the…

News
New buildings in Frankfurt’s historic city center – cornerstone is laid for the DomRömer project

Around halfway through the construction period, on 23rd January 2012, the cornerstone for the new buildings in Frankfurt’s historic city center was…

News
Ground-breaking ceremony for a primary school with daycare facility and indoor swimming pool in Frankfurt-Riedberg

In the north of Frankfurt, the new residential district of Frank­furt-Riedberg is currently under construction; in the long term, it will provide…

News
Opening of the redesigned Brentanopark in Frankfurt am Main

The opening ceremony for the fully redesigned Brentanopark and the two new bridges over the River Nidda took place on Friday 2nd March in the presence…

News
1st prize in competition for Kienlesberg bridge, Ulm

In cooperation with Knight Ar­chi­tects (UK), KREBS+KIEFER won a competition held by Stadtwerke Ulm for a new bridge for local public transport,…

News
Official start of tunneling for the Branich tunnel in Schriesheim

As part of a bypass for the town of Schriesheim, the 1.796 m long Bra­nich ­tun­nel is being built on the L 536 road. The tunnel will pass under the…

News
Foundation stone is laid for Taunusturm building in Frankfurt am Main

The foundation stone for Frankfurt’s 170 m high Taunusturm was laid on 18th January 2012 in the presence of City Mayor Dr. Petra Roth.

This project is…

News
Opening of research center for regenerative therapies (CRTD) in Dresden

After nine months of construction and eighteen months of finishing work, the state-of-the-art extension to the new center for regenerative…

News
Breakthrough in new Kaiser-Wilhelm-Tunnel in Cochem

After more than 130 years, a second tunnel tube is being added to the old Kaiser-Wilhelm-Tun­nel - at 4.242 meters one of Germany’s longest railway…

News
The new „Mosquée de l’Algérie“ in Algeria

On 31st October 2011, the cornerstone for the new „Mosquée de l’Algérie“ was laid as part of an official ceremony attended by the German…

News
Ground-breaking ceremony for major overhaul of the double-chamber lock at Kachlet

The official ground-breaking ceremony for this 86 million Euro project took place in Passau on 10th October 2011 in the presence of State Secretary…

News
Opening of Heimsheim – Wurmberg section of A 8 motorway

The official opening ceremony of this section of the A 8 motorway between Stutt­gart and Pforzheim took place on 17th October 2011 in the…

News
Topping-out ceremony for the Riedberg-Gymnasium near Frankfurt am Main

Frankfurt‘s Deputy Mayor and head of education, Jutta Ebeling of the Green party, shared an interesting fact at the topping-out ceremony on 12th…

News
Opening of Peek & Cloppenburg flagship store in Vienna

„A department store is not a normal shop. It is much more like a marketplace, a public space. As we open this store, we bring the marketplace to…

News
Steel trusses cross the River Nidda

As part of the „Neue Mitte Bad Vilbel“ (new town center in Bad Vilbel) project, a public library with gastronomy is being built across the River Nidda…

News
Topping-out ceremony for the Space 20 office building in Darmstadt

On 11th August 2011, after only seven months of construction, the topping-out ceremony for Space 20 was held in Robert-Bosch-Straße in…

News
Topping-out ceremony for the National Stadium in Bucharest, Romania

The topping-out ceremony for the National Stadium took place in Bucharest on 28th July 2011.

The soccer stadium for 55.000 spectators…

News
Belfry of Kreuzkirche in Dresden restored

The bells of the Kreuzkirche in Dresden had been silent for more than two years - since 9th March 2009. An expert report assessed damage to the steel…

News
Ground-breaking ceremony for Skyline Plaza, Frankurt am Main

The realization of this project - which is directly adjacent to the Frankfurt exhibition grounds and has been planned for more than a decade…

News
Opening of the Hohensaaten road bridge on 27th May 2011

On 27th May 2011, the replacement road bridge at Hohensaaten was officially opened to traffic. A speech on behalf the owner was given by the…

News
PIANC Annual General Asssembly in Berlin in May 2011:KREBS+KIEFER reports on the new ship lift at Niederfinow

The PIANC Annual General Asssembly took place from 16th to 19th May at the Federal Ministry of Transport, Building and Urban Development…

News
Laying two foundation stones on 23 May 2011 on the former site of the Technical University of Applied Sciences Wildau

On 23 May 2011, Minister of Science Sabine Kunst (2nd from left) and university governor Laszlo Ungvari (4th from left) ceremonially laid the two…

News
Official opening of the Kreuzstraße Tunnel in Tuttlingen

On 17.02.2011, the official opening of the Kreuzstraße urban tunnel took place in Tuttlingen. An introductory address by Mr. Hans-Joachim Bumann, the…

News
Waldschlösschen bridge over the Elbe in Dresden is in position

On 19th December 2010, the central section of the Waldschlösschen bridge was moved into its final position over the River Elbe.

To do this, the 140…

News
Topping-out ceremony for the gas turbine plant in Darmstadt

On 2nd December 2010, the topping-out ceremony for the gas turbine plant in Darmstadt took place in the presence of those involved in the planning and…

News
New lock in Fürstenberg an der Havel:Opening in time for the 2010 summer season

Fürstenberg lock was officially opened on 6th June 2010, following a 6-month closure of the Oder-Havel waterway. In the presence of Thomas…

News
Ground-breaking ceremony for the extension of the Marie-Elisabeth-Lüders-Haus

The ground-breaking ceremony for the extension of the Marie-Elisabeth-Lüders Haus in the Parlamentsviertel district in Berlin Mitte took…

News
Topping-out ceremony for the Peek & Cloppenburg flagship store in Vienna

A topping-out ceremony on 10th November 2010 marked the official completion of construction of the shell of a new flagship store in Vienna…

News
Topping-out Ceremony for the Operation Center at Frankfurt Airport

On 3rd November 2010, the topping-out ceremony for Building 181 at Frankfurt Airport took place with the participation of those involved in…

News
Research center for regenerative therapies (CRTD) in Dresden: Topping-out ceremony in April 2010

On 21st April 2010, all those involved in the planning and construction of the new center for regenerative therapies (CRTD) in Dresden met…

News
Opening of the “Topography of Terror” Documentation and Visitor Center in Berlin on 6th May 2010

Central elements of the Third Reich terror regime were located on the site around the former Prinz-Albrecht-Palais: the SS, Gestapo and the…

News
New “Topography of Terror“ Documentation Center in Berlin:Handover to the “Topography of Terror“ foundation on 24th February 2010

For around 25 years, the “Topography of Terror“ foundation had wished to develop its own special documentation center on a historically significant…

News
Center for Microsystems and Materials, Berlin Adlershof:Topping-out ceremony on 8th March 2010

The new Center for Microsystems and Materials includes laboratory and office space as well as a hall with clean room conditions for the establishment…

News
Ground-breaking ceremony for the new E.ON Bayern AG headquarters in Regensburg

Construction of a new office building and competence center for E.ON Bayern AG in Lilienthalstraße in Regensburg officially started with the…

News
Official handover ceremony for the Federal Ministry of Food, Agriculture and Consumer Protection in Berlin

A new building for the Federal Ministry of Food, Agriculture and Consumer Protection in Berlin was officially handed over to its users on 28.01.2010.^

News
Ground-breaking ceremony for a new school cafeteria and sports hall at the Integrierte Gesamtschule (IGS) Bretzenheim in Mainz

A ground-breaking ceremony on 13th December 2010 marked the official start of construction of a new cafeteria and a three-area sports hall for the IGS…

News
Opening ceremony for the new BayArena in Leverkusen on 13th August 2009

On schedule, two days before the season’s first home game against SC Hoffenheim, the BayArena was ceremonially opened on 13th August 2009 following…

News
Center for Regenerative Therapies Dresden: Start of construction work

Following completion of the special civil engineering work for its pile foundations, construction of the Center for Regenerative Therapies Dresden…

News
Groundbreaking ceremony for major transportation project in Karlsruhe

As an advance measure for the “Kombilösung” tramline project in the center of Karlsruhe –
a once-in-a-century undertaking expected to cost…

News
KREBS+KIEFER is a member of the German Sustainable Building Council (DGNB)

Since 11th March 2009, KREBS+KIEFER Beratende Ingenieure GmbH has been a member of the the German Sustainable Building Council (DGNB).

DGNB e.V. is a…

News
Last section of the A 96 Munich - Lindau motorway opened for traffic

After 40 years of planning and 32 years of construction, the goal was reached: on 23.11.2009, the last section in the A 96 Munich – Lindau motorway…

News
Contract for "Mosque of Algiers" signed during Chancellor Merkel's visit to Algeria

The general planning contract for the"Mosque of Algiers" was signed on 17.07.2008 in the presence of Chancellor Angela Merkel and President…

News
A 111 motorway, Tunnel at Tegel Airport (TFT), Safety Officer unter RABT 2006

On 13.06.2008, after an 18-month construction period during which the A 111 was completely closed, the tunnel at Tegel Airport (known as the TFT) was…

News
New ship lift at the Three Gorges Dam on the Yangtze River in China

A new ship lift using the counterbalance principle is to be built to transport passenger ships past the gigantic Three Gorges Dam on the Yangtze River…